The most recent finding is open to read. The full record of 6, with dates and corrections, is in the report.
Medium HighCorrected 8 Jun 2026Standard 746.4907(a)(1)
Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
A total of four playground were observed. One of the four playground did not have six inches of surfacing loose filing of mulch near the slide impact zone to reduce the risk of injury to children.
Corrected, verified by the state on 8 Jun 2026
Medium HighCorrected 8 Jun 2026Standard 746.4907(a)(1)
Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
A total of four playground were observed. One of the four playground did not have six inches of surfacing loose filing of mulch near the slide impact zone to reduce the risk of injury to children.
Medium LowCorrected 21 Jan 2025Standard 746.303(b)
Report Number of Employees
The operation is being cited by assessment because the operation failed to report the number of employees left the childcare center by the previous calendar year 2024.
Medium LowCorrected 21 Jan 2025Standard 746.303(b)
Report Number of Employees
The operation is being cited by assessment because the operation failed to report the number of employees left the childcare center by the previous calendar year 2024.
Read all 6 findings
Every narrative the inspector wrote, the date, the severity, and whether it was corrected. One payment, no subscription.
Get the full report, $12